1 pre-design - 2 main Chaigai - 3 water reform - 4 Wood - 5 tiling --6 whitewash finish - 7 kitchen ceiling - 8 cabinet installation - 9 doors installed - 10 floors installed --11 Stones Wallpaper - 12 radiators installed --13 alternate socket --14 lighting installation - 15 metal ware installation --16 curtain rod installation --17 pioneering cleaning --18 furniture into the field --19 appliances installed - 20 homes completed, roughly 20 by Zhao that step done.

(a) pre-design

same architecture, and the distinction lies in the bees, the bees build is a reflection of instinct, and in construction before the mind to fashion ideas and structure first. So, if the metaphor of a home-improvement movement, the decoration of the pre-design is the war of the

in the initial design, the friends must also do one thing, it is their room for a detailed measurement, we do not make the idle, the best fathom yourself again, measurements should include: < / p>

1, explicit the area contained in the renovation process. Especially the tiling area, one area of ​​wall paint, wallpaper, area, floor area;

2, apparently the main wall feet inch. After the need to design, principally furniture, wall feet-inch display.

(b) of the main Chaigai

into the construction phase, the main Chaigai is the first on a project, including cutting down walls, drywall, plaster spatula, split heating, for plastic-steel windows and so on. Main Chaigai plainly, is the first site to get cracking the first frame.

(c) water reform

transformation of the water circuit prior to the main structure Chaigai should be basically completed. Chaigai in water reform and the main interlock between the two, the developer set alongside on the inlet, outlet hood position, put along some recommendations. Include:

1, take a look at the hood outlet location would not influence the subsequent installation of the hood;

2, take a look at the suitability of the position of water meters;

3, to watch the location on the outlet of the tank is easy to install after.

cabinet for the first measurement, there is tiny experience of a friend can complete on their own. After the transformation was complete, water is best followed by the toilet water to do. Kitchen ordinarily do not need to do water.

(D) Wood

carpentry, bricklaying, construction of the oil workers are part of the Basic principle is played - who dirty on who should.

(e) tiling

in the

1, window-stone, cruel window sill installation. Window-stone floor tile installation can be done with, you can likewise after the floor tile, relentless window sill of the window cover is generally nice after installation, laborers will install marble glue to arrange glass-li, lightly put the marble and glass-li with plastic window cover sealed.

2, floor drain installation. Floor drain is a home improvement hardware in the premier advent, as it ought and the floor tiles together with the installation. So, friends, shopping at the opening of creating matters, it should arrest the early baby purchase floor drain.

3, hood installation. Hood is the first appearance of appliances, pantry tiles laid out, you can consider installing a hood.

(f) house painter paint

Prepare wallpaper friends, just to make

(g) kitchen ceiling

cabinets installed as part of the head of the ceiling, or in the continuation of the family's While in the kitchen ceiling, kitchen humidity Ceiling fan (Yuba) should have been bought. Best friends to kitchen ceiling, flare (Yuba) to put in a good, or head and outlet prologues remain.

(h) installation of kitchen cabinets

ceiling after some cabinet door can be installed. Hopefully, 1 daytime to complete. Be installed along the sink (may not comprise the upper and lower parts of water) and gas stove, cabinets before installing the best coordination of the attribute to pass gas, because gas stove gas test is required after installed.

numerous friends who choose waterproof gypsum board ceiling kitchen with waterproof paint, decoration team quote for more than $ 120 per square meter, than Lvkou Ban, PVC wall panel ceiling to be priceless. Gypsum board ceiling looks visually smooth, merely after the altitude surface of water if there are problems, or downstairs with the upstairs drip needs repair, the whole gypsum board ceiling will be cleared many more trouble than the wall panel ceiling. Therefore, we select the plasterboard ceiling in the time need to be alert.

(nine) doors installed

installed in the cabinet the next day, early in the month before the doors of the calculation is complete, now about installed. Well, then, is one day, put the door in the meantime to install the hinge, door locks, to absorb. Related hardware should be prepared in advance.

doors of the factory-installed if you want the window cover, Pass, then manufacturers of wooden doors, measure the time should be measured, and the day of installation to install the doors, taking into account the marble windowsill Installing the wrong time back, backward the window cover after installation. Note: doors making cycle is generally one month, so in order for the period of assembly close to the main doors as early as possible after the completion of Chaigai door manufacturers to measure the openings feet inch. On the openings of the processing, we need to note that if the elevation of inconsistency home openings, workers need to be processed into tall - agreeable.

(x) floor installation

doors installed in the floor can be installed the next day, and things go smoothly, but also the time of day. Ji floor installation requires attention to the following questions:

1, the floor prior to installation, it is best to give the plant door examine about the need for leveling the ground or in part, leveling, and some renovation or refurbishment of the company team will recommend leveling the ground or in part with Pok leveling, to the actual factory floor Survey preponderate;

2, the floor prior to installation, home of the sidewalk on the floor floor to be cleaned, to ensure namely the dry ground, so the cleaning process does no water.

3, floor installation, capable to do so, be sure to tear the floor in the corridor.

(k) Paving wallpaper

installed on the floor the next day, the family clean up, and you can about wallpaper Stones, and goes well, the same day. Able to do so, paving the wallpaper of the day, the floor should do someone to protect; conditions did not matter to clean wallpaper glue left on the floor cleaning is no problem to the Wild. Paving wallpaper before the walls to try to make

(l) heat sink

wallpaper paved in the next day, replace the radiator or radiator Chaigai friends can hang down the wall of the radiator. Same day.

doors - floor - Wallpaper - radiator, which is a universally recognized appropriate installation sequence, first floor loading door is to ensure that the baseboard and doors can close the door pockets bonding; after wallpaper installed mainly because the installation of the floor more sordid, more dust, pollution of the wallpaper. Used afresh here said earlier, Finally only the wall mounted radiator because the radiator to install wallpaper paved.

successive fitting process is gradually creature impeded with the assorted constraints under conditions designed. Even thou there are exceptions, such as Huo Chelsea Heights doors need to be installed after the floor-gated, but such exceptions are infrequent in the renovation process.

(m) switch socket

(n) lighting installation

mounted lights, nought to say. Bahrain lights, the household lit up, command goodbye to the decoration 100-watt incandescent lamp glare - sensibility good.

(xv) metal ware installation

bought ahead the upper and lower pipe fittings, bathroom accessories, restroom, drying racks, etc., be installed on both.

in front of those Is no amplification to say that the first time you open the water watched the water dragon, a good label -

(XVI) curtain rod installation

shutter wand installation marks the end of the basic home promotion

(q) pioneering cleaning

pioneering cleaning before, not curtains, remember, Pioneering cleaning, the family do not have furniture and appliances are not necessary to reserve more of the

(xviii) Furniture approach

on furniture to buy time, at the earliest after the achievement of the transformation in the water circumference, so choose the basic foot-inch scope of furniture was generally a digit of our centers. So, some friends before the start of the renovation has not been eager to set up furniture,9923.org, private feel no absence.

(XIX) appliance approach

to this time, the approach of the appliance approach, the installation of the installation, ready to stay up!

(xx) home accessories

home accessories, home improvement the last step, and has been decorated by the fitting to include the installation of curtain are all part of home accessories. As for buying curtains, rather in a good set of furniture, the neatness in order to lest conflict. Home accessories can also consider buying some plants, wall masterpiece, decorative crafts and so on and so on ... ... In short, stay, you can freely activity.

Second, the renovation process of the two divided

peruse the first partition of the friends might feel a little chaotic, in order to facilitate further understanding of all the 20 steps, and some need to pay consideration during the entrainment part, in front of the 20-step basis, joined 10, as with:

1 for start programs - 2 self-measurement - 3 initial design - 4 main Chaigai - 5 wooden door manufacturers measure --6 cabinet first measurement - 7 water reform - 8 toilet water - -9 Ingredients approach - 10 Woodworking --11 tiling (installed gulf windows, floor drain) - 12 installed hood --13 cabinet second measurement --14 whitewash finish - 15 kitchen ceiling - 16 via the gas --17 cabinet installation (to install the sink, gas stove) - 18 wooden doors installed --19 flooring installation - 20 Stones Wallpaper --21 radiator installation --22 switch socket --23 lighting installation - 24 metal ware installed - 25 curtain rod installation --26 pioneering cleaning --27 Furniture approach --28 appliances installed --29 home accessories --30 push

;

(a) the whole process of fitting the four-step classification

broad-brush, said, according to Zhao Wen said in the beginning portion of the 20 department, the elaboration of the entire process can be divided into the following 4 areas:

1, the design appearances; (1)

2, construction sectors; (2-6)

3, install the part; (7-16)

4, ending part. (17-20)

(b) fitting into the whole process of the six-step

along Zhao engineering characteristics, along to Zhao fair said into 30 areas, upkeep of the plenary process can be divided into the following six steps:

first step: design ideas; (3)

Step two: the main Chaigai; (4)

third step: hidden project; (7)

Fourth step: covering engineering; (10,11,14,15,19,20)

fifth step: the installation phase; (17,18,21,22,23,24,25)

Step Six: ending phase. (26,27,28,29,30)

specifically:

1, to distinguish it from the bees, we must first have design ideas;

2, the chief Chaigai is to send the site into a completely empty chamber. Chaigai including the cardinal contents of the on just said -

3, hidden project, the equivalent of Covert projects to do first, that is, we constantly mention

4, covering engineering, as to the home Wood window cover, Pass, bricklaying tiling, window-stone, window installation, fuel painting work - lumber, tile, oil namely the foundation of these 3 projects, the behind walls panel dome, ground coverings, paper after , even wear dress over;

5, installation period, mainly to complete the functional implementation. Including: cabinets, gates, radiators, switches, sockets, lighting installation, hardware, sanitary ware, curtain rod ... ... Each item has its own set of features;

6, the final stages, expressly, is to not constitute

by Section II,

Finally, a friend who left a 10 job caption, 10 points as each answer, out of 100. Can get 80 points or more friends, the mandate of a renovation, you be the basic grasp.

1, 2 door cabinet measured in what time?

2, doors, flooring, wallpaper construction order?

3, why the

4, carpentry, bricklaying, oil workers in order that?

5, what is the first time to buy furniture, appliances more fitting?

6, the main structure of the room and the water circuit transformation Chaigai who should be?

7, what time tile approach more appropriate?

8, wooden window cover and the stone ledge that the first load?

9, the hardware when installed in the floor drain?

10, do the cleaning time is appropriate at what time?

Read this point, there are some words to acquaint the decoration of the friends, the more practical, memorize!

; ;

; ;

; ;

; ; shoe

1, the section will not be the first boot, leaving a little space so that shoes can leak into the bottom ash, sink and gas stove top mounted light. Given the location of the bathroom floor drain must first consider well, a good value of foot-inch. Drain the best side in the brick, the brick in the medium situation if so, how to tilt either brick, floor drain is not the lowest point.

2, bathroom, air-conditioning outlets were not designed to switch. Especially the bathroom water heater, a couple of level switch with a plug appropriate. To go off electric, drag the plug there is danger of Xian.

3, sun angle on tile part of the manipulation, in the end is a sweeping look at the basis class personnel. If the level of good workers, plasterers, tile tools and wear better, they should not hesitate to select the practice of grinding 45-degree angle. In achieve, at all times a good grinding, grinding 45-degree approximate angle of the sun angle is the maximum beautiful! If the level is indeed not quite good worker, then you still choose to use assured angle of it, because the mill's wrong train not as good as 45-degree angle with the angle of the sun's effects.

4, line up the pipes after the water oppression test is also very essential. Test, we must all be present, and the test for at least 30 minutes, conditions permitting, the best one hour. 10 kg oppression, without any abatement before the final test.

5, while the iron doors steel doors must be considered a good foot inch frame protruding walls to advise the installer, production the last frame and had finished the wall tiles are flat, so not only pretty, and good health to do.

6, woodworker and mason's Door archive is to knot the tiling, including door pocket of time to consider the following ground (the ground side of the door both side) is also tiled, or other cement mortar object, because if you paste porcelain front door pocket fix is good, has packages to the ground, with concrete in the future, if concrete and Door tainted, moldy water will guide to Door timber.

7, beneath the bed and mattress board must be breathable. Bed board is generally best to use cedar board.

8, do the paint as much as periodical tape.

9, buy a lamp to note: li generally try to use cup, stainless steel, copper or wood shelves), and generally do not buy whichever additional coating steel plated, ah, ah what variety of paint, easily disappear.

10, consist in ... ceramic basin basin, glass basin li downright health.

11, water reform arrange to be their own good, ask them to slot straight line. Watching them draw their own line, draw the line at all slotted. Each have their own approval Caixing.

12, water must be good, be sure to test the water!

13, a lot of construction in the verbal concert into the breach checkout massacred, must be written in dark and white, mushroom or reduce in amounts of items are sure to ask, write it!

14, ground floor, if installed, to re-do all the ground re-smooth cement floor.

15, the kitchen door, or the decoration of wood to make wooden hanging rail doors for good.

16, the living room as many as feasible to setup the power plug.

17, is still to be done appearance the shower toilet partitions. Not trouble the simple way to pull a shower curtain, the actual inconvenience, water everywhere.

18, do door and door frame of the wood material to choose carefully the material.

;